RUIYAMACHINERY
All projects

Dalil Anwar

Effort for Syria Rebuild after Civil War in Aleppo

A 4 ft 3+5 high-speed impregnation line with UF/MF glue preparation, commissioned in Aleppo in December 2019 and trialled at speeds up to 41 m/min.

Region
Aleppo, Syria
Industry
Melamine decorative paper
Project year
2019
Production line
RY-1500B 4 ft 3+5 High-Speed Impregnation Line
Effort for Syria Rebuild after Civil War in Aleppo

Project overview

01

The challenge

Imported melamine paper was costly in post-war Aleppo, while domestic transport and site access remained difficult.

02

Engineering solution

NTRY supplied a 4 ft 3+5 high-speed line with UF/MF glue preparation. Engineers crossed four countries and more than 30 checkpoints to install and commission it in Aleppo.

03

Project outcome

The line and glue kitchen were commissioned in December 2019, with successful trials at 41, 39, 35, and 29 m/min; 41 m/min was the highest recorded trial speed.

Source-recorded metrics

41 m/minhighest recorded trial speed
4countries crossed
30+checkpoints passed

Data is drawn from the original project records. Final contractual parameters are governed by the project documentation.

Project gallery

Effort for Syria Rebuild after Civil War in Aleppo 1
Effort for Syria Rebuild after Civil War in Aleppo 2
Effort for Syria Rebuild after Civil War in Aleppo 3
Effort for Syria Rebuild after Civil War in Aleppo 4
Effort for Syria Rebuild after Civil War in Aleppo 5

Engineering scope

High-speed impregnation line

Supply and commission the 4 ft 3+5 RY-1500B line.

Glue kitchen

Integrate UF and MF resin preparation systems.

Logistics and commissioning

Coordinate travel, access, installation, trials, and technical support.

Project timeline

01

Investment

The customer committed to the line and glue kitchen in August 2019.

02

Installation journey

Engineers crossed four countries and more than 30 checkpoints to reach the site.

03

Trials and commissioning

Completed successful production trials in December 2019.